top of page

YEAR 2

construction & detailing 2

27   /   02   /   2023

This is a follow-up from INSP3 AHL project.

It is a detailed drawing of the floor to ceiling constructions, as well as a physical model to showcase.

Below is the attached pdf of a closeup construction and detailed drawing of the toilet's fixtures

DETAILED DRAWING OF FIXTURES

bottom of page