YEAR 2

integrated studio project 2

16   /   08   /   2022

This project was worked with residents of Sembawang Block 306B. It was a project to redesign the 5 story carpark of Block 306B.

Since the carpark was of a very huge area, the project was brought down to a 1000m2 focus area and a rough concept of 50% of the whole carpark (level 3 to 5).

Below you can find the attached design brief storyboard (not finalised) and finalised design storyboard. Lastly, Spatial Design Studies (SDS) physical model of focus area of the carpark.